Skip to content

Deferred mirror build gating

← Back to all
  • Infrastructure

The staging build check was in place, but mirror and cross-tenant checks were still unresolved. This item was deferred.

Details

HTPR-5737 - Pre-merge Vercel build gate; staging gate in place, but mirror gating per evidence to be resolved; pending cross-tenant gating confirmation.